<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	xmlns:georss="http://www.georss.org/georss" xmlns:geo="http://www.w3.org/2003/01/geo/wgs84_pos#" xmlns:media="http://search.yahoo.com/mrss/"
	>

<channel>
	<title>tara wings: Palo Colorado Canyon, Big Sur, CA</title>
	<atom:link href="http://tarawings.wordpress.com/feed/" rel="self" type="application/rss+xml" />
	<link>http://tarawings.wordpress.com</link>
	<description>news from the woods</description>
	<lastBuildDate>Thu, 15 Apr 2010 20:12:25 +0000</lastBuildDate>
	<language>en</language>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
	<generator>http://wordpress.com/</generator>
<cloud domain='tarawings.wordpress.com' port='80' path='/?rsscloud=notify' registerProcedure='' protocol='http-post' />
<image>
		<url>http://s2.wp.com/i/buttonw-com.png</url>
		<title>tara wings: Palo Colorado Canyon, Big Sur, CA</title>
		<link>http://tarawings.wordpress.com</link>
	</image>
	<atom:link rel="search" type="application/opensearchdescription+xml" href="http://tarawings.wordpress.com/osd.xml" title="tara wings: Palo Colorado Canyon, Big Sur, CA" />
	<atom:link rel='hub' href='http://tarawings.wordpress.com/?pushpress=hub'/>
		<item>
		<title>4/15/2010:  HIGHWAY 1 CARMEL TO CAMBRIA PROJECT UPDATE</title>
		<link>http://tarawings.wordpress.com/2010/04/15/4152010-highway-1-carmel-to-cambria-project-update/</link>
		<comments>http://tarawings.wordpress.com/2010/04/15/4152010-highway-1-carmel-to-cambria-project-update/#comments</comments>
		<pubDate>Thu, 15 Apr 2010 20:12:25 +0000</pubDate>
		<dc:creator>tarawings</dc:creator>
				<category><![CDATA[Uncategorized]]></category>

		<guid isPermaLink="false">http://tarawings.wordpress.com/?p=114</guid>
		<description><![CDATA[ HIGHWAY 1 CARMEL TO CAMBRIA PROJECT UPDATE MONTEREY COUNTY – Roadwork continues on a retaining wall project near Gamboa Point, three miles north of Lucia. A temporary signal is in place with work expected to be complete in June. Work hours are Mondays through Fridays from 7:00 am to 5:00 pm.   Traffic continues down [...]<img alt="" border="0" src="http://stats.wordpress.com/b.gif?host=tarawings.wordpress.com&amp;blog=4157207&amp;post=114&amp;subd=tarawings&amp;ref=&amp;feed=1" width="1" height="1" />]]></description>
			<content:encoded><![CDATA[<p><strong> HIGHWAY 1 CARMEL TO CAMBRIA PROJECT UPDATE</strong></p>
<p><strong>MONTEREY</strong><strong> COUNTY</strong> –</p>
<ul>
<li>Roadwork continues on a retaining wall project near Gamboa Point, three miles north of Lucia. A temporary signal is in place with work expected to be complete in June. Work hours are Mondays through Fridays from 7:00 am to 5:00 pm.</li>
</ul>
<p> </p>
<ul>
<li>Traffic continues down to one lane just south of Lucia utilizing stop signs as a new temporary signal will be installed by the end of April to perform slide stabilization and exploratory drilling with temporary slope stabilization. Work hours are Mondays through Fridays from 7:00 am to 5:00 pm.</li>
</ul>
<p> </p>
<ul>
<li>The temporary signal about two miles south of Lucia at Pitkins Curve/Rain Rocks for</li>
</ul>
<p>     the bridge/rockshed project remains in operation 24/7 and the project is expected to</p>
<p>     be complete in 2013.</p>
<ul>
<li>Rock slope protection continues on Hwy. 1 at Shale Point, nine miles north of</li>
</ul>
<p>     Ragged Point or three miles south of Gorda, which are both about seven miles into</p>
<p>     the Monterey County Line from San Luis Obispo. This segment of Hwy. 1 continues</p>
<p>     with roadwork during daytime hours (7:30 am to 5 pm) through the end of April but</p>
<p>     traffic control is no longer required.</p>
<p>Caltrans reminds motorists that “we’re here to get you there.”</p>
<p>For more information on you can call the toll-free project hotline at (888) 836-0866 or visit <a href="http://www.dot.ca.gov/dist05/projects/pitkins/index.htm">www.dot.ca.gov/dist05/projects/pitkins/index.htm</a>.</p>
<br />  <a rel="nofollow" href="http://feeds.wordpress.com/1.0/gocomments/tarawings.wordpress.com/114/"><img alt="" border="0" src="http://feeds.wordpress.com/1.0/comments/tarawings.wordpress.com/114/" /></a> <a rel="nofollow" href="http://feeds.wordpress.com/1.0/godelicious/tarawings.wordpress.com/114/"><img alt="" border="0" src="http://feeds.wordpress.com/1.0/delicious/tarawings.wordpress.com/114/" /></a> <a rel="nofollow" href="http://feeds.wordpress.com/1.0/gofacebook/tarawings.wordpress.com/114/"><img alt="" border="0" src="http://feeds.wordpress.com/1.0/facebook/tarawings.wordpress.com/114/" /></a> <a rel="nofollow" href="http://feeds.wordpress.com/1.0/gotwitter/tarawings.wordpress.com/114/"><img alt="" border="0" src="http://feeds.wordpress.com/1.0/twitter/tarawings.wordpress.com/114/" /></a> <a rel="nofollow" href="http://feeds.wordpress.com/1.0/gostumble/tarawings.wordpress.com/114/"><img alt="" border="0" src="http://feeds.wordpress.com/1.0/stumble/tarawings.wordpress.com/114/" /></a> <a rel="nofollow" href="http://feeds.wordpress.com/1.0/godigg/tarawings.wordpress.com/114/"><img alt="" border="0" src="http://feeds.wordpress.com/1.0/digg/tarawings.wordpress.com/114/" /></a> <a rel="nofollow" href="http://feeds.wordpress.com/1.0/goreddit/tarawings.wordpress.com/114/"><img alt="" border="0" src="http://feeds.wordpress.com/1.0/reddit/tarawings.wordpress.com/114/" /></a> <img alt="" border="0" src="http://stats.wordpress.com/b.gif?host=tarawings.wordpress.com&amp;blog=4157207&amp;post=114&amp;subd=tarawings&amp;ref=&amp;feed=1" width="1" height="1" />]]></content:encoded>
			<wfw:commentRss>http://tarawings.wordpress.com/2010/04/15/4152010-highway-1-carmel-to-cambria-project-update/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
	
		<media:content url="http://1.gravatar.com/avatar/77fca5f69343288387ec7c7b2e16a0e5?s=96&#38;d=identicon&#38;r=G" medium="image">
			<media:title type="html">tarawings</media:title>
		</media:content>
	</item>
		<item>
		<title>3/11/2010: HIGHWAY 1 CARMEL TO CAMBRIA PROJECT UPDATE</title>
		<link>http://tarawings.wordpress.com/2010/03/11/3112010-highway-1-carmel-to-cambria-project-update/</link>
		<comments>http://tarawings.wordpress.com/2010/03/11/3112010-highway-1-carmel-to-cambria-project-update/#comments</comments>
		<pubDate>Thu, 11 Mar 2010 21:16:50 +0000</pubDate>
		<dc:creator>tarawings</dc:creator>
				<category><![CDATA[Road Conditions]]></category>

		<guid isPermaLink="false">http://tarawings.wordpress.com/?p=112</guid>
		<description><![CDATA[MONTEREY COUNTY – The night closure due to the slide just south of Gorda is now fully open without delays day or night.   Roadwork continues on a retaining wall project near Gamboa Point, three miles north of Lucia. A temporary signal is in place with work expected to be complete in June. Work hours [...]<img alt="" border="0" src="http://stats.wordpress.com/b.gif?host=tarawings.wordpress.com&amp;blog=4157207&amp;post=112&amp;subd=tarawings&amp;ref=&amp;feed=1" width="1" height="1" />]]></description>
			<content:encoded><![CDATA[<p><strong>MONTEREY</strong><strong> COUNTY</strong> –</p>
<ul>
<li><strong>The night closure due to the slide just south of Gorda is now fully open without delays day or night.</strong></li>
</ul>
<p> </p>
<ul>
<li>Roadwork continues on a retaining wall project near Gamboa Point, three miles north of Lucia. A temporary signal is in place with work expected to be complete in June. Work hours are Mondays through Fridays from 7:00 am to 5:00 pm.</li>
</ul>
<p> </p>
<ul>
<li>Traffic is also down to one lane just south of Lucia utilizing stop signs as a new temporary signal will be installed in the coming weeks to perform slide stabilization and exploratory drilling with temporary slope stabilization. Work hours are Mondays through Fridays from 7:00 am to 5:00 pm.</li>
</ul>
<p> </p>
<ul>
<li>The temporary signal about  two miles south of Lucia at Pitkins Curve/Rain Rocks for</li>
</ul>
<p>     the bridge/rockshed project remains in operation 24/7 and the project is expected to</p>
<p>     be complete in 2013.</p>
<ul>
<li>Rock slope protection continues on Hwy. 1 at Shale Point, nine miles north of</li>
</ul>
<p>     Ragged Point or three miles south of Gorda, which are both about seven miles into</p>
<p>     the Monterey County Line from San Luis Obispo. This segment of Hwy. 1 continues with</p>
<p>     roadwork during daytime hours (7:30 am to 5 pm) through mid-April but traffic control is</p>
<p>     no longer required.</p>
<p><strong>SAN LUIS OBISPO</strong><strong> COUNTY</strong>—</p>
<ul>
<li>The installation of several horizontal drains on Highway 1, one mile north of Ragged</li>
</ul>
<p>     Point is now complete.</p>
<br />  <a rel="nofollow" href="http://feeds.wordpress.com/1.0/gocomments/tarawings.wordpress.com/112/"><img alt="" border="0" src="http://feeds.wordpress.com/1.0/comments/tarawings.wordpress.com/112/" /></a> <a rel="nofollow" href="http://feeds.wordpress.com/1.0/godelicious/tarawings.wordpress.com/112/"><img alt="" border="0" src="http://feeds.wordpress.com/1.0/delicious/tarawings.wordpress.com/112/" /></a> <a rel="nofollow" href="http://feeds.wordpress.com/1.0/gofacebook/tarawings.wordpress.com/112/"><img alt="" border="0" src="http://feeds.wordpress.com/1.0/facebook/tarawings.wordpress.com/112/" /></a> <a rel="nofollow" href="http://feeds.wordpress.com/1.0/gotwitter/tarawings.wordpress.com/112/"><img alt="" border="0" src="http://feeds.wordpress.com/1.0/twitter/tarawings.wordpress.com/112/" /></a> <a rel="nofollow" href="http://feeds.wordpress.com/1.0/gostumble/tarawings.wordpress.com/112/"><img alt="" border="0" src="http://feeds.wordpress.com/1.0/stumble/tarawings.wordpress.com/112/" /></a> <a rel="nofollow" href="http://feeds.wordpress.com/1.0/godigg/tarawings.wordpress.com/112/"><img alt="" border="0" src="http://feeds.wordpress.com/1.0/digg/tarawings.wordpress.com/112/" /></a> <a rel="nofollow" href="http://feeds.wordpress.com/1.0/goreddit/tarawings.wordpress.com/112/"><img alt="" border="0" src="http://feeds.wordpress.com/1.0/reddit/tarawings.wordpress.com/112/" /></a> <img alt="" border="0" src="http://stats.wordpress.com/b.gif?host=tarawings.wordpress.com&amp;blog=4157207&amp;post=112&amp;subd=tarawings&amp;ref=&amp;feed=1" width="1" height="1" />]]></content:encoded>
			<wfw:commentRss>http://tarawings.wordpress.com/2010/03/11/3112010-highway-1-carmel-to-cambria-project-update/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
	
		<media:content url="http://1.gravatar.com/avatar/77fca5f69343288387ec7c7b2e16a0e5?s=96&#38;d=identicon&#38;r=G" medium="image">
			<media:title type="html">tarawings</media:title>
		</media:content>
	</item>
		<item>
		<title>3/10/2010: HWY 1 at Gorda Road Update</title>
		<link>http://tarawings.wordpress.com/2010/03/10/3102010-hwy-1-at-gorda-road-update/</link>
		<comments>http://tarawings.wordpress.com/2010/03/10/3102010-hwy-1-at-gorda-road-update/#comments</comments>
		<pubDate>Wed, 10 Mar 2010 20:53:31 +0000</pubDate>
		<dc:creator>tarawings</dc:creator>
				<category><![CDATA[Road Conditions]]></category>

		<guid isPermaLink="false">http://tarawings.wordpress.com/?p=109</guid>
		<description><![CDATA[MONTEREY COUNTY – Hwy. 1 just south of Gorda (Alder Creek Slide) is fully open during the daytime hours from 7 am to 6 pm. The road will close again overnight tonight from 6 pm to 7 am. Caltrans will reassess the slide conditions each morning and provide updates accordingly. All businesses in the area [...]<img alt="" border="0" src="http://stats.wordpress.com/b.gif?host=tarawings.wordpress.com&amp;blog=4157207&amp;post=109&amp;subd=tarawings&amp;ref=&amp;feed=1" width="1" height="1" />]]></description>
			<content:encoded><![CDATA[<p><strong>MONTEREY COUNTY – </strong>Hwy. 1 just south of Gorda (Alder Creek Slide) is fully open during the daytime hours from 7 am to 6 pm. The road will close again overnight tonight from 6 pm to 7 am.</p>
<p>Caltrans will reassess the slide conditions each morning and provide updates accordingly.</p>
<p><strong>All businesses in the area remain open to the public.</strong></p>
<br />  <a rel="nofollow" href="http://feeds.wordpress.com/1.0/gocomments/tarawings.wordpress.com/109/"><img alt="" border="0" src="http://feeds.wordpress.com/1.0/comments/tarawings.wordpress.com/109/" /></a> <a rel="nofollow" href="http://feeds.wordpress.com/1.0/godelicious/tarawings.wordpress.com/109/"><img alt="" border="0" src="http://feeds.wordpress.com/1.0/delicious/tarawings.wordpress.com/109/" /></a> <a rel="nofollow" href="http://feeds.wordpress.com/1.0/gofacebook/tarawings.wordpress.com/109/"><img alt="" border="0" src="http://feeds.wordpress.com/1.0/facebook/tarawings.wordpress.com/109/" /></a> <a rel="nofollow" href="http://feeds.wordpress.com/1.0/gotwitter/tarawings.wordpress.com/109/"><img alt="" border="0" src="http://feeds.wordpress.com/1.0/twitter/tarawings.wordpress.com/109/" /></a> <a rel="nofollow" href="http://feeds.wordpress.com/1.0/gostumble/tarawings.wordpress.com/109/"><img alt="" border="0" src="http://feeds.wordpress.com/1.0/stumble/tarawings.wordpress.com/109/" /></a> <a rel="nofollow" href="http://feeds.wordpress.com/1.0/godigg/tarawings.wordpress.com/109/"><img alt="" border="0" src="http://feeds.wordpress.com/1.0/digg/tarawings.wordpress.com/109/" /></a> <a rel="nofollow" href="http://feeds.wordpress.com/1.0/goreddit/tarawings.wordpress.com/109/"><img alt="" border="0" src="http://feeds.wordpress.com/1.0/reddit/tarawings.wordpress.com/109/" /></a> <img alt="" border="0" src="http://stats.wordpress.com/b.gif?host=tarawings.wordpress.com&amp;blog=4157207&amp;post=109&amp;subd=tarawings&amp;ref=&amp;feed=1" width="1" height="1" />]]></content:encoded>
			<wfw:commentRss>http://tarawings.wordpress.com/2010/03/10/3102010-hwy-1-at-gorda-road-update/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
	
		<media:content url="http://1.gravatar.com/avatar/77fca5f69343288387ec7c7b2e16a0e5?s=96&#38;d=identicon&#38;r=G" medium="image">
			<media:title type="html">tarawings</media:title>
		</media:content>
	</item>
		<item>
		<title>3/8/2010: Highway 1 Re-Opens with Traffic Control South of Gorda</title>
		<link>http://tarawings.wordpress.com/2010/03/08/382010-highway-1-re-opens-with-traffic-control-south-of-gorda/</link>
		<comments>http://tarawings.wordpress.com/2010/03/08/382010-highway-1-re-opens-with-traffic-control-south-of-gorda/#comments</comments>
		<pubDate>Mon, 08 Mar 2010 21:11:01 +0000</pubDate>
		<dc:creator>tarawings</dc:creator>
				<category><![CDATA[Road Conditions]]></category>

		<guid isPermaLink="false">http://tarawings.wordpress.com/2010/03/08/382010-highway-1-re-opens-with-traffic-control-south-of-gorda/</guid>
		<description><![CDATA[HIGHWAY 1 RE-OPENS WITH TRAFFIC CONTROL SOUTH OF GORDA MONTEREY COUNTY –The closure just south of Gorda (Alder Creek Slide) reopened this morning with one-way traffic control with flaggers from 7 am to 6 pm with up to 2-hour delays. The road will close again overnight tonight from 6 pm to 7 am. Caltrans will [...]<img alt="" border="0" src="http://stats.wordpress.com/b.gif?host=tarawings.wordpress.com&amp;blog=4157207&amp;post=107&amp;subd=tarawings&amp;ref=&amp;feed=1" width="1" height="1" />]]></description>
			<content:encoded><![CDATA[<p><strong><span style="text-decoration:underline;">HIGHWAY 1 RE-OPENS WITH TRAFFIC CONTROL SOUTH OF GORDA</span></strong></p>
<p><strong>MONTEREY</strong><strong> COUNTY</strong><strong> –</strong>The closure just south of Gorda (Alder Creek Slide) reopened this morning with one-way traffic control with flaggers from 7 am to 6 pm with up to 2-hour delays. The road will close again overnight tonight from 6 pm to 7 am.</p>
<p>Caltrans will reassess the slide conditions each morning and provide updates accordingly.</p>
<p><strong>All businesses in the area remain open to the public.</strong></p>
<br />  <a rel="nofollow" href="http://feeds.wordpress.com/1.0/gocomments/tarawings.wordpress.com/107/"><img alt="" border="0" src="http://feeds.wordpress.com/1.0/comments/tarawings.wordpress.com/107/" /></a> <a rel="nofollow" href="http://feeds.wordpress.com/1.0/godelicious/tarawings.wordpress.com/107/"><img alt="" border="0" src="http://feeds.wordpress.com/1.0/delicious/tarawings.wordpress.com/107/" /></a> <a rel="nofollow" href="http://feeds.wordpress.com/1.0/gofacebook/tarawings.wordpress.com/107/"><img alt="" border="0" src="http://feeds.wordpress.com/1.0/facebook/tarawings.wordpress.com/107/" /></a> <a rel="nofollow" href="http://feeds.wordpress.com/1.0/gotwitter/tarawings.wordpress.com/107/"><img alt="" border="0" src="http://feeds.wordpress.com/1.0/twitter/tarawings.wordpress.com/107/" /></a> <a rel="nofollow" href="http://feeds.wordpress.com/1.0/gostumble/tarawings.wordpress.com/107/"><img alt="" border="0" src="http://feeds.wordpress.com/1.0/stumble/tarawings.wordpress.com/107/" /></a> <a rel="nofollow" href="http://feeds.wordpress.com/1.0/godigg/tarawings.wordpress.com/107/"><img alt="" border="0" src="http://feeds.wordpress.com/1.0/digg/tarawings.wordpress.com/107/" /></a> <a rel="nofollow" href="http://feeds.wordpress.com/1.0/goreddit/tarawings.wordpress.com/107/"><img alt="" border="0" src="http://feeds.wordpress.com/1.0/reddit/tarawings.wordpress.com/107/" /></a> <img alt="" border="0" src="http://stats.wordpress.com/b.gif?host=tarawings.wordpress.com&amp;blog=4157207&amp;post=107&amp;subd=tarawings&amp;ref=&amp;feed=1" width="1" height="1" />]]></content:encoded>
			<wfw:commentRss>http://tarawings.wordpress.com/2010/03/08/382010-highway-1-re-opens-with-traffic-control-south-of-gorda/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
	
		<media:content url="http://1.gravatar.com/avatar/77fca5f69343288387ec7c7b2e16a0e5?s=96&#38;d=identicon&#38;r=G" medium="image">
			<media:title type="html">tarawings</media:title>
		</media:content>
	</item>
		<item>
		<title>2/27/2010:  A TSUNAMI ADVISORY IS IN EFFECT FROM POINT ARENA TO POINT PIEDRAS BLANCAS</title>
		<link>http://tarawings.wordpress.com/2010/02/27/2272010-a-tsunami-advisory-is-in-effect-from-point-arena-to-point-piedras-blancas/</link>
		<comments>http://tarawings.wordpress.com/2010/02/27/2272010-a-tsunami-advisory-is-in-effect-from-point-arena-to-point-piedras-blancas/#comments</comments>
		<pubDate>Sat, 27 Feb 2010 21:37:58 +0000</pubDate>
		<dc:creator>tarawings</dc:creator>
				<category><![CDATA[Uncategorized]]></category>

		<guid isPermaLink="false">http://tarawings.wordpress.com/2010/02/27/2272010-a-tsunami-advisory-is-in-effect-from-point-arena-to-point-piedras-blancas/</guid>
		<description><![CDATA[A TSUNAMI ADVISORY IS IN EFFECT FROM POINT ARENA TO POINT PIEDRAS BLANCAS<img alt="" border="0" src="http://stats.wordpress.com/b.gif?host=tarawings.wordpress.com&amp;blog=4157207&amp;post=105&amp;subd=tarawings&amp;ref=&amp;feed=1" width="1" height="1" />]]></description>
			<content:encoded><![CDATA[<p>A TSUNAMI ADVISORY IS IN EFFECT FROM POINT ARENA TO POINT PIEDRAS BLANCAS</p>
<br />  <a rel="nofollow" href="http://feeds.wordpress.com/1.0/gocomments/tarawings.wordpress.com/105/"><img alt="" border="0" src="http://feeds.wordpress.com/1.0/comments/tarawings.wordpress.com/105/" /></a> <a rel="nofollow" href="http://feeds.wordpress.com/1.0/godelicious/tarawings.wordpress.com/105/"><img alt="" border="0" src="http://feeds.wordpress.com/1.0/delicious/tarawings.wordpress.com/105/" /></a> <a rel="nofollow" href="http://feeds.wordpress.com/1.0/gofacebook/tarawings.wordpress.com/105/"><img alt="" border="0" src="http://feeds.wordpress.com/1.0/facebook/tarawings.wordpress.com/105/" /></a> <a rel="nofollow" href="http://feeds.wordpress.com/1.0/gotwitter/tarawings.wordpress.com/105/"><img alt="" border="0" src="http://feeds.wordpress.com/1.0/twitter/tarawings.wordpress.com/105/" /></a> <a rel="nofollow" href="http://feeds.wordpress.com/1.0/gostumble/tarawings.wordpress.com/105/"><img alt="" border="0" src="http://feeds.wordpress.com/1.0/stumble/tarawings.wordpress.com/105/" /></a> <a rel="nofollow" href="http://feeds.wordpress.com/1.0/godigg/tarawings.wordpress.com/105/"><img alt="" border="0" src="http://feeds.wordpress.com/1.0/digg/tarawings.wordpress.com/105/" /></a> <a rel="nofollow" href="http://feeds.wordpress.com/1.0/goreddit/tarawings.wordpress.com/105/"><img alt="" border="0" src="http://feeds.wordpress.com/1.0/reddit/tarawings.wordpress.com/105/" /></a> <img alt="" border="0" src="http://stats.wordpress.com/b.gif?host=tarawings.wordpress.com&amp;blog=4157207&amp;post=105&amp;subd=tarawings&amp;ref=&amp;feed=1" width="1" height="1" />]]></content:encoded>
			<wfw:commentRss>http://tarawings.wordpress.com/2010/02/27/2272010-a-tsunami-advisory-is-in-effect-from-point-arena-to-point-piedras-blancas/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
	
		<media:content url="http://1.gravatar.com/avatar/77fca5f69343288387ec7c7b2e16a0e5?s=96&#38;d=identicon&#38;r=G" medium="image">
			<media:title type="html">tarawings</media:title>
		</media:content>
	</item>
		<item>
		<title>2/18/2010: HIGHWAY 1 CARMEL TO CAMBRIA PROJECT UPDATE</title>
		<link>http://tarawings.wordpress.com/2010/02/18/2182010-highway-1-carmel-to-cambria-project-update/</link>
		<comments>http://tarawings.wordpress.com/2010/02/18/2182010-highway-1-carmel-to-cambria-project-update/#comments</comments>
		<pubDate>Thu, 18 Feb 2010 21:02:25 +0000</pubDate>
		<dc:creator>tarawings</dc:creator>
				<category><![CDATA[Road Conditions]]></category>

		<guid isPermaLink="false">http://tarawings.wordpress.com/?p=102</guid>
		<description><![CDATA[Date:               Thursday, February 18, 2010 District:          5 &#8211; Santa Barbara, SLO, Monterey, Santa Cruz and San Benito Counties Contact:         Susana Z. Cruz (Bilingual) or Colin Jones Phone:            (805) 549-3138 or (805) 549-3189 FOR IMMEDIATE RELEASE  HIGHWAY 1 CARMEL TO CAMBRIA PROJECT UPDATE MONTEREY COUNTY – Roadwork continues on a retaining wall project near Gamboa Point, [...]<img alt="" border="0" src="http://stats.wordpress.com/b.gif?host=tarawings.wordpress.com&amp;blog=4157207&amp;post=102&amp;subd=tarawings&amp;ref=&amp;feed=1" width="1" height="1" />]]></description>
			<content:encoded><![CDATA[<p><strong>Date:</strong>               Thursday, February 18, 2010</p>
<p><strong>District:</strong>          5 &#8211; Santa Barbara, SLO, Monterey, Santa Cruz and San Benito Counties</p>
<p><strong>Contact:</strong>         Susana Z. Cruz (Bilingual) or Colin Jones</p>
<p><strong>Phone:</strong>            (805) 549-3138 or (805) 549-3189</p>
<p>FOR IMMEDIATE RELEASE</p>
<p><strong> HIGHWAY 1 CARMEL TO CAMBRIA PROJECT UPDATE</strong></p>
<p><strong>MONTEREY</strong><strong> COUNTY</strong> –</p>
<ul>
<li>Roadwork continues on a retaining wall project near Gamboa Point, three miles north of Lucia. A temporary signal is in place with work expected to be complete in June. Work hours are Mondays through Fridays from 7:00 am to 5:00 pm.</li>
</ul>
<p> </p>
<ul>
<li>Traffic is also down to one lane just south of Lucia utilizing stop signs as a new temporary signal will be installed in the coming weeks to perform slide stabilization and exploratory drilling with temporary slope stabilization. Work hours are Mondays through Fridays from 7:00 am to 5:00 pm</li>
</ul>
<p> </p>
<ul>
<li>The temporary signal about  two miles south of Lucia at Pitkins Curve/Rain Rocks for</li>
</ul>
<p>     the bridge/rockshed project remains in operation 24/7 and the project is expected to</p>
<p>     be complete in 2013.</p>
<ul>
<li>Rock slope protection continues on Hwy. 1 at Shale Point, nine miles north of</li>
</ul>
<p>     Ragged Point or three miles south of Gorda, which are both about seven miles into</p>
<p>     the Monterey County Line from San Luis Obispo. This segment of Hwy. 1 will</p>
<p>     continue with roadwork during daytime hours <strong>(7:30 am to 5 pm) </strong>with reverse one-</p>
<p>     way traffic control through Mid-April.</p>
<p><strong>SAN LUIS OBISPO</strong><strong> COUNTY</strong>—</p>
<ul>
<li>Construction continues with the installation of several horizontal drains on Highway 1,</li>
</ul>
<p>     one mile north of Ragged Point during the daytime only, with one-way traffic control</p>
<p>     with flaggers continuing from 7:00 am until 4:00 pm Monday through Thursday and</p>
<p>     until 2 pm on Fridays. Work is expected to be complete at the end of February,</p>
<p>     weather permitting.</p>
<p>Caltrans reminds motorists that “we’re here to get you there.”</p>
<p>For more information on you can call the toll-free project hotline at (888) 836-0866 or visit <a href="http://www.dot.ca.gov/dist05/projects/pitkins/index.htm">www.dot.ca.gov/dist05/projects/pitkins/index.htm</a>.</p>
<br />  <a rel="nofollow" href="http://feeds.wordpress.com/1.0/gocomments/tarawings.wordpress.com/102/"><img alt="" border="0" src="http://feeds.wordpress.com/1.0/comments/tarawings.wordpress.com/102/" /></a> <a rel="nofollow" href="http://feeds.wordpress.com/1.0/godelicious/tarawings.wordpress.com/102/"><img alt="" border="0" src="http://feeds.wordpress.com/1.0/delicious/tarawings.wordpress.com/102/" /></a> <a rel="nofollow" href="http://feeds.wordpress.com/1.0/gofacebook/tarawings.wordpress.com/102/"><img alt="" border="0" src="http://feeds.wordpress.com/1.0/facebook/tarawings.wordpress.com/102/" /></a> <a rel="nofollow" href="http://feeds.wordpress.com/1.0/gotwitter/tarawings.wordpress.com/102/"><img alt="" border="0" src="http://feeds.wordpress.com/1.0/twitter/tarawings.wordpress.com/102/" /></a> <a rel="nofollow" href="http://feeds.wordpress.com/1.0/gostumble/tarawings.wordpress.com/102/"><img alt="" border="0" src="http://feeds.wordpress.com/1.0/stumble/tarawings.wordpress.com/102/" /></a> <a rel="nofollow" href="http://feeds.wordpress.com/1.0/godigg/tarawings.wordpress.com/102/"><img alt="" border="0" src="http://feeds.wordpress.com/1.0/digg/tarawings.wordpress.com/102/" /></a> <a rel="nofollow" href="http://feeds.wordpress.com/1.0/goreddit/tarawings.wordpress.com/102/"><img alt="" border="0" src="http://feeds.wordpress.com/1.0/reddit/tarawings.wordpress.com/102/" /></a> <img alt="" border="0" src="http://stats.wordpress.com/b.gif?host=tarawings.wordpress.com&amp;blog=4157207&amp;post=102&amp;subd=tarawings&amp;ref=&amp;feed=1" width="1" height="1" />]]></content:encoded>
			<wfw:commentRss>http://tarawings.wordpress.com/2010/02/18/2182010-highway-1-carmel-to-cambria-project-update/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
	
		<media:content url="http://1.gravatar.com/avatar/77fca5f69343288387ec7c7b2e16a0e5?s=96&#38;d=identicon&#38;r=G" medium="image">
			<media:title type="html">tarawings</media:title>
		</media:content>
	</item>
		<item>
		<title>2/8/2010: SOUTHBOUND LANE OF HWY. 1 CLOSED SOUTH OF LUCIA</title>
		<link>http://tarawings.wordpress.com/2010/02/08/282010-southbound-lane-of-hwy-1-closed-south-of-lucia/</link>
		<comments>http://tarawings.wordpress.com/2010/02/08/282010-southbound-lane-of-hwy-1-closed-south-of-lucia/#comments</comments>
		<pubDate>Mon, 08 Feb 2010 21:07:18 +0000</pubDate>
		<dc:creator>tarawings</dc:creator>
				<category><![CDATA[Road Conditions]]></category>

		<guid isPermaLink="false">http://tarawings.wordpress.com/?p=99</guid>
		<description><![CDATA[SOUTHBOUND LANE OF HWY. 1 CLOSED SOUTH OF LUCIA   MONTEREY COUNTY – The southbound lane of Hwy. 1 south of Lucia is closed for approximately 200 feet due to storm related damage to the shoulder of the highway.  The northbound lane of traffic remains open. Temporary guardrail has been placed along the shoulder of [...]<img alt="" border="0" src="http://stats.wordpress.com/b.gif?host=tarawings.wordpress.com&amp;blog=4157207&amp;post=99&amp;subd=tarawings&amp;ref=&amp;feed=1" width="1" height="1" />]]></description>
			<content:encoded><![CDATA[<h5>SOUTHBOUND LANE OF HWY. 1 CLOSED SOUTH OF LUCIA</h5>
<p> </p>
<p><strong>MONTEREY</strong><strong> COUNTY</strong><strong> – </strong>The southbound lane of Hwy. 1 south of Lucia is closed <strong>for approximately 200 feet</strong> due to storm related damage to the shoulder of the highway.  The northbound lane of traffic remains open.</p>
<p>Temporary guardrail has been placed along the shoulder of the southbound lane with stop signs on either end. Motorists will use one-way reversing traffic control via stop signs which will be in place 24/7 until further notice.</p>
<p>Motorists can expect a minimal delay.</p>
<p><strong>All businesses in the area remain open to the public.</strong></p>
<p>Caltrans reminds motorists that ‘we’re here to get you there.’</p>
<p>For traffic updates on other state highways in the Monterey County, motorists can call Caltrans District 5 Public Affairs at 805-549-3318 or visit the District 5 website at: <a href="http://www.dot.ca.gov/dist05/maint/road/mont.htm">http://www.dot.ca.gov/dist05/maint/road/mont.htm</a></p>
<br />  <a rel="nofollow" href="http://feeds.wordpress.com/1.0/gocomments/tarawings.wordpress.com/99/"><img alt="" border="0" src="http://feeds.wordpress.com/1.0/comments/tarawings.wordpress.com/99/" /></a> <a rel="nofollow" href="http://feeds.wordpress.com/1.0/godelicious/tarawings.wordpress.com/99/"><img alt="" border="0" src="http://feeds.wordpress.com/1.0/delicious/tarawings.wordpress.com/99/" /></a> <a rel="nofollow" href="http://feeds.wordpress.com/1.0/gofacebook/tarawings.wordpress.com/99/"><img alt="" border="0" src="http://feeds.wordpress.com/1.0/facebook/tarawings.wordpress.com/99/" /></a> <a rel="nofollow" href="http://feeds.wordpress.com/1.0/gotwitter/tarawings.wordpress.com/99/"><img alt="" border="0" src="http://feeds.wordpress.com/1.0/twitter/tarawings.wordpress.com/99/" /></a> <a rel="nofollow" href="http://feeds.wordpress.com/1.0/gostumble/tarawings.wordpress.com/99/"><img alt="" border="0" src="http://feeds.wordpress.com/1.0/stumble/tarawings.wordpress.com/99/" /></a> <a rel="nofollow" href="http://feeds.wordpress.com/1.0/godigg/tarawings.wordpress.com/99/"><img alt="" border="0" src="http://feeds.wordpress.com/1.0/digg/tarawings.wordpress.com/99/" /></a> <a rel="nofollow" href="http://feeds.wordpress.com/1.0/goreddit/tarawings.wordpress.com/99/"><img alt="" border="0" src="http://feeds.wordpress.com/1.0/reddit/tarawings.wordpress.com/99/" /></a> <img alt="" border="0" src="http://stats.wordpress.com/b.gif?host=tarawings.wordpress.com&amp;blog=4157207&amp;post=99&amp;subd=tarawings&amp;ref=&amp;feed=1" width="1" height="1" />]]></content:encoded>
			<wfw:commentRss>http://tarawings.wordpress.com/2010/02/08/282010-southbound-lane-of-hwy-1-closed-south-of-lucia/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
	
		<media:content url="http://1.gravatar.com/avatar/77fca5f69343288387ec7c7b2e16a0e5?s=96&#38;d=identicon&#38;r=G" medium="image">
			<media:title type="html">tarawings</media:title>
		</media:content>
	</item>
		<item>
		<title>2/4/2010: HWY 1 Updates- No More Overnight Closures/Big Sur River Project Completed</title>
		<link>http://tarawings.wordpress.com/2010/02/04/242010-hwy-1-updates-no-more-overnight-closuresbig-sur-river-project-completed/</link>
		<comments>http://tarawings.wordpress.com/2010/02/04/242010-hwy-1-updates-no-more-overnight-closuresbig-sur-river-project-completed/#comments</comments>
		<pubDate>Thu, 04 Feb 2010 20:48:39 +0000</pubDate>
		<dc:creator>tarawings</dc:creator>
				<category><![CDATA[Road Conditions]]></category>

		<guid isPermaLink="false">http://tarawings.wordpress.com/2010/02/04/242010-hwy-1-updates-no-more-overnight-closuresbig-sur-river-project-completed/</guid>
		<description><![CDATA[ HIGHWAY 1 CARMEL TO CAMBRIA PROJECTS UPDATE MONTEREY COUNTY – Caltrans officials continues with no more overnight       closures due to roadway erosion on Hwy. 1, nine miles north of Ragged Point  or       three miles south of Gorda, which are both about seven miles into the Monterey      County Line from San Luis Obispo. [...]<img alt="" border="0" src="http://stats.wordpress.com/b.gif?host=tarawings.wordpress.com&amp;blog=4157207&amp;post=98&amp;subd=tarawings&amp;ref=&amp;feed=1" width="1" height="1" />]]></description>
			<content:encoded><![CDATA[<p><strong> HIGHWAY 1 CARMEL TO CAMBRIA PROJECTS UPDATE</strong></p>
<ul>
<li><strong>MONTEREY</strong><strong> COUNTY</strong> – Caltrans officials continues with <strong>no more overnight</strong></li>
</ul>
<p><strong>      closures</strong> due to roadway erosion on Hwy. 1, nine miles north of Ragged Point  or</p>
<p>      three miles south of Gorda, which are both about seven miles into the Monterey</p>
<p>     County Line from San Luis Obispo.</p>
<p>     This segment of Hwy. 1 will continue with continue roadwork during daytime hours</p>
<p>     <strong>(7:30 am to 5 pm) </strong>with reverse one-way traffic control through Mid-April</p>
<ul>
<li>The emergency project to prevent the Big Sur River from cutting into the embankment by the Big Sur Lodge/Pfeiffer State Park Entrance <strong>has been completed</strong>.</li>
</ul>
<p> </p>
<ul>
<li>The temporary signal south of Lucia for the bridge/rockshed project remains in</li>
</ul>
<p>     operation 24/7 and project is expected to be complete in 2013.</p>
<ul>
<li><strong>SAN LUIS OBISPO</strong><strong> COUNTY</strong>&#8211;Construction continues with the installation of several horizontal drains on Highway 1 one mile north of Ragged Point during the daytime only, with one-way traffic control with flaggers will continue from 7:00 am until 4:00 pm Monday through Thursday and until 2 pm on Fridays. Work is expected to be complete at the end of February.</li>
</ul>
<p> </p>
<p>Caltrans reminds motorists that “we’re here to get you there.”</p>
<p>For more information on you can call the toll-free project hotline at (888) 836-0866 or visit <a href="http://www.dot.ca.gov/dist05/projects/pitkins/index.htm">www.dot.ca.gov/dist05/projects/pitkins/index.htm</a>.</p>
<br />  <a rel="nofollow" href="http://feeds.wordpress.com/1.0/gocomments/tarawings.wordpress.com/98/"><img alt="" border="0" src="http://feeds.wordpress.com/1.0/comments/tarawings.wordpress.com/98/" /></a> <a rel="nofollow" href="http://feeds.wordpress.com/1.0/godelicious/tarawings.wordpress.com/98/"><img alt="" border="0" src="http://feeds.wordpress.com/1.0/delicious/tarawings.wordpress.com/98/" /></a> <a rel="nofollow" href="http://feeds.wordpress.com/1.0/gofacebook/tarawings.wordpress.com/98/"><img alt="" border="0" src="http://feeds.wordpress.com/1.0/facebook/tarawings.wordpress.com/98/" /></a> <a rel="nofollow" href="http://feeds.wordpress.com/1.0/gotwitter/tarawings.wordpress.com/98/"><img alt="" border="0" src="http://feeds.wordpress.com/1.0/twitter/tarawings.wordpress.com/98/" /></a> <a rel="nofollow" href="http://feeds.wordpress.com/1.0/gostumble/tarawings.wordpress.com/98/"><img alt="" border="0" src="http://feeds.wordpress.com/1.0/stumble/tarawings.wordpress.com/98/" /></a> <a rel="nofollow" href="http://feeds.wordpress.com/1.0/godigg/tarawings.wordpress.com/98/"><img alt="" border="0" src="http://feeds.wordpress.com/1.0/digg/tarawings.wordpress.com/98/" /></a> <a rel="nofollow" href="http://feeds.wordpress.com/1.0/goreddit/tarawings.wordpress.com/98/"><img alt="" border="0" src="http://feeds.wordpress.com/1.0/reddit/tarawings.wordpress.com/98/" /></a> <img alt="" border="0" src="http://stats.wordpress.com/b.gif?host=tarawings.wordpress.com&amp;blog=4157207&amp;post=98&amp;subd=tarawings&amp;ref=&amp;feed=1" width="1" height="1" />]]></content:encoded>
			<wfw:commentRss>http://tarawings.wordpress.com/2010/02/04/242010-hwy-1-updates-no-more-overnight-closuresbig-sur-river-project-completed/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
	
		<media:content url="http://1.gravatar.com/avatar/77fca5f69343288387ec7c7b2e16a0e5?s=96&#38;d=identicon&#38;r=G" medium="image">
			<media:title type="html">tarawings</media:title>
		</media:content>
	</item>
		<item>
		<title>1/29/2010: 2 HWY 1 Updates (9 Miles N of Ragged Point and Big Sur River Project)</title>
		<link>http://tarawings.wordpress.com/2010/01/29/1292010-2-hwy-1-updates-9-miles-n-of-ragged-point-and-big-sur-river-project/</link>
		<comments>http://tarawings.wordpress.com/2010/01/29/1292010-2-hwy-1-updates-9-miles-n-of-ragged-point-and-big-sur-river-project/#comments</comments>
		<pubDate>Sat, 30 Jan 2010 07:39:38 +0000</pubDate>
		<dc:creator>tarawings</dc:creator>
				<category><![CDATA[Road Conditions]]></category>

		<guid isPermaLink="false">http://tarawings.wordpress.com/2010/01/29/1292010-2-hwy-1-updates-9-miles-n-of-ragged-point-and-big-sur-river-project/</guid>
		<description><![CDATA[HIGHWAY 1 NORTH OF RAGGED POINT NOW OPEN OVERNIGHT MONTEREY COUNTY – Caltrans officials announced today there will be no more overnight closures due to roadway erosion on Hwy. 1, nine miles north of Ragged Point  or three miles south of Gorda, which are both about seven miles into the Monterey County Line from San [...]<img alt="" border="0" src="http://stats.wordpress.com/b.gif?host=tarawings.wordpress.com&amp;blog=4157207&amp;post=97&amp;subd=tarawings&amp;ref=&amp;feed=1" width="1" height="1" />]]></description>
			<content:encoded><![CDATA[<p>HIGHWAY 1 NORTH OF RAGGED POINT NOW OPEN OVERNIGHT</p>
<p>MONTEREY COUNTY – Caltrans officials announced today there will be no more overnight closures due to roadway erosion on Hwy. 1, nine miles north of Ragged Point  or three miles south of Gorda, which are both about seven miles into the Monterey County Line from San Luis Obispo.</p>
<p>This segment of Hwy. 1 will continue with continue roadwork during daytime hours (7:30 am to 5 pm) with reverse one-way traffic control.</p>
<p>A section of fill has been washed out by ocean surf due to recent heavy rains.</p>
<p>ß The temporary signal south of Lucia for the bridge/rockshed project remains in<br />
operation.</p>
<p>SAN LUIS OBISPO COUNTY&#8211;Construction has resumed to install several horizontal drains on Highway 1 one mile north of Ragged Point during the daytime only, with one-way  traffic control with flaggers will continue from 7:00 am until 4:00 pm Monday through Thursday and until 2 pm on Fridays.</p>
<p>______</p>
<p>***UPDATE 2***<br />
EMERGENCY BIG SUR RIVER PROJECT ON HIGHWAY 1 BEGINS NEXT WEEK</p>
<p>MONTEREY COUNTY – An emergency project to prevent the Big Sur River from cutting into the embankment by the Big Sur Lodge/Big Sur Park Campgrounds begins next Monday, Feb. 1, Caltrans officials announced today.</p>
<p>Alternating lane closures with one-way reverse traffic control will be in effect from 7 am to 5 pm Mondays through Fridays for two weeks with closures primarily on the northbound side. Up to 10-minute delays are anticipated</p>
<p>There are power lines in the work zone so PG&amp;E will be shutting down the power for one day only on Monday, Feb. 1, from 8 am to 3 pm due to a power line relocation and setting two power poles across the road. Caltrans roadwork will begin on Tuesday, Feb. 2 and continue for two weeks through mid-February.</p>
<p>The project is necessary as the Big Sur River is rapidly eroding the hillside. Big rocks, approximately 5’ x 5’ x 5’ will be placed via crane in the river to keep it from further cutting into the roadway embankment.</p>
<p>Granite Construction of Watsonville is the contractor for this $925,000 emergency project.</p>
<p>Caltrans reminds motorists that “we’re here to get you there.”</p>
<p>For more information on you can call the toll-free project hotline at (888) 836-0866 or visit www.dot.ca.gov/dist05/projects/pitkins/index.htm.</p>
<br />  <a rel="nofollow" href="http://feeds.wordpress.com/1.0/gocomments/tarawings.wordpress.com/97/"><img alt="" border="0" src="http://feeds.wordpress.com/1.0/comments/tarawings.wordpress.com/97/" /></a> <a rel="nofollow" href="http://feeds.wordpress.com/1.0/godelicious/tarawings.wordpress.com/97/"><img alt="" border="0" src="http://feeds.wordpress.com/1.0/delicious/tarawings.wordpress.com/97/" /></a> <a rel="nofollow" href="http://feeds.wordpress.com/1.0/gofacebook/tarawings.wordpress.com/97/"><img alt="" border="0" src="http://feeds.wordpress.com/1.0/facebook/tarawings.wordpress.com/97/" /></a> <a rel="nofollow" href="http://feeds.wordpress.com/1.0/gotwitter/tarawings.wordpress.com/97/"><img alt="" border="0" src="http://feeds.wordpress.com/1.0/twitter/tarawings.wordpress.com/97/" /></a> <a rel="nofollow" href="http://feeds.wordpress.com/1.0/gostumble/tarawings.wordpress.com/97/"><img alt="" border="0" src="http://feeds.wordpress.com/1.0/stumble/tarawings.wordpress.com/97/" /></a> <a rel="nofollow" href="http://feeds.wordpress.com/1.0/godigg/tarawings.wordpress.com/97/"><img alt="" border="0" src="http://feeds.wordpress.com/1.0/digg/tarawings.wordpress.com/97/" /></a> <a rel="nofollow" href="http://feeds.wordpress.com/1.0/goreddit/tarawings.wordpress.com/97/"><img alt="" border="0" src="http://feeds.wordpress.com/1.0/reddit/tarawings.wordpress.com/97/" /></a> <img alt="" border="0" src="http://stats.wordpress.com/b.gif?host=tarawings.wordpress.com&amp;blog=4157207&amp;post=97&amp;subd=tarawings&amp;ref=&amp;feed=1" width="1" height="1" />]]></content:encoded>
			<wfw:commentRss>http://tarawings.wordpress.com/2010/01/29/1292010-2-hwy-1-updates-9-miles-n-of-ragged-point-and-big-sur-river-project/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
	
		<media:content url="http://1.gravatar.com/avatar/77fca5f69343288387ec7c7b2e16a0e5?s=96&#38;d=identicon&#38;r=G" medium="image">
			<media:title type="html">tarawings</media:title>
		</media:content>
	</item>
		<item>
		<title>1/28/2010: Big Sur River Project on HWY 1 Begin Next Week</title>
		<link>http://tarawings.wordpress.com/2010/01/28/1282010-big-sur-river-project-on-hwy-1-begin-next-week/</link>
		<comments>http://tarawings.wordpress.com/2010/01/28/1282010-big-sur-river-project-on-hwy-1-begin-next-week/#comments</comments>
		<pubDate>Thu, 28 Jan 2010 21:21:32 +0000</pubDate>
		<dc:creator>tarawings</dc:creator>
				<category><![CDATA[Road Conditions]]></category>

		<guid isPermaLink="false">http://tarawings.wordpress.com/2010/01/28/1282010-big-sur-river-project-on-hwy-1-begin-next-week/</guid>
		<description><![CDATA[We’ve got another highway project that is going to begin right away. To clarify, this project is at the entrance to Big Sur Lodge and Pfeiffer Big Sur State Park. EMERGENCY BIG SUR RIVER PROJECT ON HIGHWAY 1 BEGINS NEXT WEEK MONTEREY COUNTY – An emergency project to prevent the Big Sur River from cutting [...]<img alt="" border="0" src="http://stats.wordpress.com/b.gif?host=tarawings.wordpress.com&amp;blog=4157207&amp;post=95&amp;subd=tarawings&amp;ref=&amp;feed=1" width="1" height="1" />]]></description>
			<content:encoded><![CDATA[<p><strong>We’ve got another highway project that is going to begin right away. To clarify, this project is at the entrance to Big Sur Lodge and <span style="text-decoration:underline;">Pfeiffer Big Sur State Park</span>. </strong></p>
<p><strong>EMERGENCY BIG SUR RIVER PROJECT ON HIGHWAY 1 BEGINS NEXT WEEK</strong></p>
<p><strong>MONTEREY COUNTY</strong> – An emergency project to prevent the Big Sur River from cutting into the embankment by the Big Sur Lodge/Big Sur Park Campgrounds begins next Monday Feb. 1, Caltrans officials announced today.</p>
<p>Alternating lane closures with one-way reverse traffic control will be in effect from 7 am to 5 pm Mondays through Fridays for two weeks with closures primarily on the northbound side. Up to 10-minute delays are anticipated. There will be a closure this Friday, Jan. 29 from 9 am to 3:30 pm to deliver the rocks to the site and set up for next Monday’s work. <strong>This will be an <span style="text-decoration:underline;">intermittent</span> closure with one-way reverse traffic control with flagging.</strong></p>
<p>There are power lines in the way so <strong>PG&amp;E will be shutting down the power during work hours for the two-week project </strong>since there are strict specifications on the placement of a crane in relation to overhead power lines.<strong> PG&amp;E will be notifying residents/businesses from the Big Sur Lodge/Big Sur Park Campgrounds <span style="text-decoration:underline;">south</span> to the County Line informing them of the electricity shut off while work is taking place.</strong></p>
<p>The project is necessary as the Big Sur River is rapidly eroding the hillside. Big rocks, approximately 5’ x 5’ x 5’ will be placed via crane in the river to keep it from further cutting into the roadway embankment.</p>
<p>Granite Construction of Watsonville is the contractor for this $925,000 emergency project.</p>
<p>Caltrans reminds motorists that “we’re here to get you there.”</p>
<p>For more information on you can call the toll-free project hotline at (888) 836-0866 or visit www.dot.ca.gov/dist05/projects/pitkins/index.htm.</p>
<br />  <a rel="nofollow" href="http://feeds.wordpress.com/1.0/gocomments/tarawings.wordpress.com/95/"><img alt="" border="0" src="http://feeds.wordpress.com/1.0/comments/tarawings.wordpress.com/95/" /></a> <a rel="nofollow" href="http://feeds.wordpress.com/1.0/godelicious/tarawings.wordpress.com/95/"><img alt="" border="0" src="http://feeds.wordpress.com/1.0/delicious/tarawings.wordpress.com/95/" /></a> <a rel="nofollow" href="http://feeds.wordpress.com/1.0/gofacebook/tarawings.wordpress.com/95/"><img alt="" border="0" src="http://feeds.wordpress.com/1.0/facebook/tarawings.wordpress.com/95/" /></a> <a rel="nofollow" href="http://feeds.wordpress.com/1.0/gotwitter/tarawings.wordpress.com/95/"><img alt="" border="0" src="http://feeds.wordpress.com/1.0/twitter/tarawings.wordpress.com/95/" /></a> <a rel="nofollow" href="http://feeds.wordpress.com/1.0/gostumble/tarawings.wordpress.com/95/"><img alt="" border="0" src="http://feeds.wordpress.com/1.0/stumble/tarawings.wordpress.com/95/" /></a> <a rel="nofollow" href="http://feeds.wordpress.com/1.0/godigg/tarawings.wordpress.com/95/"><img alt="" border="0" src="http://feeds.wordpress.com/1.0/digg/tarawings.wordpress.com/95/" /></a> <a rel="nofollow" href="http://feeds.wordpress.com/1.0/goreddit/tarawings.wordpress.com/95/"><img alt="" border="0" src="http://feeds.wordpress.com/1.0/reddit/tarawings.wordpress.com/95/" /></a> <img alt="" border="0" src="http://stats.wordpress.com/b.gif?host=tarawings.wordpress.com&amp;blog=4157207&amp;post=95&amp;subd=tarawings&amp;ref=&amp;feed=1" width="1" height="1" />]]></content:encoded>
			<wfw:commentRss>http://tarawings.wordpress.com/2010/01/28/1282010-big-sur-river-project-on-hwy-1-begin-next-week/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
	
		<media:content url="http://1.gravatar.com/avatar/77fca5f69343288387ec7c7b2e16a0e5?s=96&#38;d=identicon&#38;r=G" medium="image">
			<media:title type="html">tarawings</media:title>
		</media:content>
	</item>
	</channel>
</rss>
